Rheilffordd Talyllyn Railway
Francais / FrenchDeutsch / GermanNederlands / Dutch
Contact us | Site updates | Other sites
Welcome!About the RailwayCome and TravelOther ServicesFor the EnthusiastJoin and Take PartNarrow Gauge Railway Museum

Latest News

Admin login | Printable version

All steam locomotives except No. 4 have now passed their annual boiler inspections. Nos. 1, 2, 3 and 7 were in steam on Sunday 10th. March when No.1 (without air pump and in grubby condition as requested) worked a photographic charter, No. 2 worked the advertised service trains and Nos. 7 and 3 top-and-tailed a six-bogie train taking passengers off a Past Time Rail excursion (behind 76079) to Dolgoch and back while the standard-gauge loco was being coaled (from the Neptune Road bridge) and watered.

Wharf (East) ground frame was reconnected (apart from the disc signals) late on Saturday afternoon.