Rheilffordd Talyllyn Railway
Francais / FrenchDeutsch / GermanNederlands / Dutch
Contact us | Site updates | Other sites
Welcome!About the RailwayCome and TravelOther ServicesFor the EnthusiastJoin and Take PartNarrow Gauge Railway Museum

Latest News

Admin login | Printable version

Available categories
All
Search news

XML News Feed
Powered By blojsom

Spring Outdoor Week: Clearing up at Wharf Station

With Spring Outdoor Week coming to a close, George Gardiner has sent these photographs of the work undertaken at Tywyn Wharf to tidy up the station area. The new siding for heritage wagons has now been laid and ballasted.


The newly laid heritage siding before ballasting.


Turning a wagon onto the siding.


The end of the new line.


Digging a hole for a cable (the power supply to the ballast dock area is going underground).


Moving rocks.


Digging another hole - this time for a drain.


Filling in the holes.


Leveling using the Bobcat.


Another barrow load of spoil.


A temporary wheelbarrow park.

Posted by hussra at Saturday, March 5, 2005 2:00:41 PM GMT.
Category: Engineering