Rheilffordd Talyllyn Railway
Francais / FrenchDeutsch / GermanNederlands / Dutch
Contact us | Site updates | Other sites
Welcome!About the RailwayCome and TravelOther ServicesFor the EnthusiastJoin and Take PartNarrow Gauge Railway Museum

Latest News

Admin login | Printable version

Available categories
All
Search news

XML News Feed
Powered By blojsom

Spring Outdoor Week 2008 - Wharf Projects

Wharf Weighbridge

Pictures showing the shuttering and concrete work on the base of the weighbridge pit.

 working on the weighbridge

weighbridge shuttering concreted

Over the coming months the sides of the pit will be built in suitable brick. Once this work is complete the weighbridge itself can be installed.

Water Column

The wooden box around the tank, in the style of the old column at
Dolgoch, will added over the coming weeks.

working on the water column

Wharf water column showing the steps

looking at the water column from the back

Thanks to Keith Theobald for the photographs and information

Posted by karenhigginson at Monday, April 7, 2008 8:02:42 PM GMT.
Category: Engineering