|
|
|||||
Latest News |
|||||
|
Admin login | Printable version Available categories
Search news
XML News Feed
Spring Outdoor Week - CynfalA short length of track was re-laid with OBS50 rail at the bottom of Cynfal Bank The Gang unbolt the fishplates Rails removed... Instant railway! A pre-prepared track panel ready to go in The Gang bolting in the longer lengths of rail. The Bobcat is used to move ballast around ready to tamp in. The new length of track. The C & T boards show that the track has a restricted speed on it until it has been properly tamped in and settled. Thanks to Keith Theobald for the pictures and the Outdoor Gang for doing all the work |
||||